Árpád Veress - ExProfessional

All about explosion protection

CapEx / OpEx / explosion protection

Published: 20/10/2025

#Ex personnel competency

CapEx / OpEx / explosion protection

CapEx / OpEx / explosion protection

Both terms (CapEx, OpEx) well we know, and apply. Relations to Ex compliance engineering? Short summary to grab your attention towards.

Capex (Capital Expenditure) in Explosion Protection

Capex = upfront investment in Ex-compliant infrastructure, equipment, and design.

- Typical Capex items
• Ex-certified equipment (motors, lighting, instruments, enclosures, cabling, etc.)
• Explosion-proof building modifications (ventilation, zoning barriers, flameproof housings)
• Compliance engineering: risk assessments, hazardous area classification, design reviews
• Certification and type approval costs

- Pros
• One-time cost with long-term reliability
• Higher baseline safety and reduced liability
• Better market access (ATEX/IECEx compliance = license to operate)
• Often reduces future Opex (less repairs, fewer incidents)

- Cons
• High upfront cost may deter management
• Requires specialized design input (not every EPC has the know-how)
• Longer procurement cycles (Ex products have lead times)



Opex (Operational Expenditure) in Explosion Protection

Opex = ongoing costs during the lifecycle of Ex operations.

- Typical Opex items
• Periodic inspections (EN/IEC 60079-17)
• Maintenance & repair (spare parts, Ex workshop approvals, certified service staff)
• Training & competence management (IECEx CoPC, ATEX worker awareness)
• Renewals, upgrades, recertification if standards change
• Corrective actions after audits or authority inspections

- Pros
• Flexible, spread over time (no big upfront cost)
• Can adapt spending to operational risks and budgets
• Keeps compliance aligned with evolving standards and site conditions

- Cons
• Adds recurring financial burden
• Risk of underfunding maintenance = non-compliance or incidents
• Hidden costs if Capex was minimized initially (cheap equipment → more repairs)

- Lifecycle Perspective
• Takeover / commissioning: Capex dominates (Ex equipment, design, certification).
• Operation: Opex dominates (inspections, competence, maintenance).
• After maintenance/repair: Both matter (certified spares = Capex, competent repairs = Opex).

Keep up good work!

Arpad
veress@exprofessional.com 

Comment section

Leave your comment

Notify me of new comments by email

Note: Your comment will only appear on the site after review. Your email address will not be visible, only your name and comment.

Stay up to date

pls subscribe :)

Subscribe